Yes, but “under” usually does not mean what it sounds like. In a new home, the tubing or cable is fastened above the insulation and then covered by the concrete, so the heat sits inside the slab. In an existing home, the heat usually has to go on top of the slab or in a thin layer over it, because putting tubing beneath an existing slab means digging it out.
Where the heat goes in a new slab
During construction, the insulation goes down first. Then the tubing or cable is fastened to it, and the concrete covers everything. This puts the heat in the mass of the floor, where the concrete can store it and release it into the room. The insulation below keeps much of the heat from leaving downward into the ground.
The layout is set before the pour, so any later work, such as anchoring walls or fixing cabinets, needs to avoid the tubing or cable. A written layout drawing helps anyone who works on the floor later.
Why an existing slab is harder
Adding heat beneath an existing slab usually means removing the floor, excavating, adding insulation, placing the tubing, and pouring a new slab. That is a large job, with real cost, disruption and risk of damage to the rooms above and around it. For that reason, the realistic options for an existing home work on top of the slab.
- A thin overpour. Tubing is laid on the old slab and covered with a thin layer of concrete or a lightweight gypsum-based topping. This raises the floor, so doors, thresholds and cabinets may need adjusting.
- Electric mats under tile. Mats are set into mortar on a prepared surface, and the tile goes on top. The height change is small, but the surface must be prepared with care.
If the room sits above a basement or crawlspace rather than a slab, the heat can be installed under the subfloor instead. That is a different design, and it has its own layout and insulation needs. Heat can also come from the ceiling, using a radiant ceiling heating system, which avoids the floor altogether.
Checks before you decide
- Slab condition. Cracks, uneven spots and existing damage should be assessed before anything is added.
- Moisture. Moisture can affect flooring and the performance of the system, so a moisture test is a sensible step before a finish goes down.
- Floor height. An overpour changes the height of the floor. Check door clearances and transitions to other rooms first.
- Flooring. Tile suits radiant heat best. Thick carpet slows the heat down.
- Heat source. Decide whether the system will run on a boiler, a heat pump or electricity, and what fuel or power supply is available.
- Insulation. Find out what insulation is already under or around the slab, if you can.
Talking to an installer
Ask an installer whether they have done retrofits over slabs like yours, and what they propose for the height change, the insulation and the controls. A good plan will explain the layout, the heat source, and how the system will be tested before it is covered up. Licensed contractors can also tell you whether permits or inspections apply where you live.